These three boards make up the next stage and when done some basic tests can be done. Page 26 runs through what tests can be done and involves some temporary cables between the front switches SR0-7 and MB0-7 that way the switches can pretend to be the MB register for a day.
IC sockets and passives are in but now have to be brave and install the actual ICs!!
No comments:
Post a Comment